Sunday, May 13, 2007

First Row In


First Row In
Originally uploaded by Mike Dec.
Matt finally had a free weekend to tile the floor. I only did a fifth of the work as his assistant which consisted of drilling backerboard down, chipping away at dry thin set, helping sponge out grout, and a million trips up and down stairs to the yard where the wet saw was. Matt of course was 5x more tired from having to cut tiles the size of placemats. But it was also my first week at my new job so I was already exhausted from the week. Then I had hauling out the crap to the curb for bulk day. But the bathroom floor looks exactly how I wanted it, the cast iron sink is in (albeit nonfunctional) and still loads of work to do. Ahhh the things I get myself into.....

No comments: